At Hendrina -Gumeni line has been divided into two sections which will be constructed simultaneously. Section A is approximately 42 km and stretches from the 400 kV Hendrina power station, about 40 km south of Middelburg, in Mpumalanga, towards the Gumeni transmission substation, close to the town of Waterval Boven. About 70% of the line will run parallel to the Arnot-Gumeni 275 kV transmission line. “Scoring an adjudication result of 97% for the Hendrina-Gumeni contract is a direct result of our commitment to creating a win-win relationship with Eskom,” says Gary Whalley, MD of Babcock’s Powerlines business. “The Eskom adjudication team complimented our winning bid and the level of professionalism of the submission. “to applying use that ref:522700961 we're looking for the following candidates × drivers code 10/14 with pdp × electricians × welders × administration/clerk * pipe Fitters * Supervisors * boiler makers * general manager * general worker's * machine operators * looking for tenders are available *For more information contact mr.mahlangu *(063)5233 514 *(013)5160 033 * Fax(086)6173229

Current Jobs in GUMENI SUBSTATIONS
Jobs 4
Apply Now
05 Nov 2020

At Hendrina Gumeni line has been divided into two sections which will be constructed simultaneously. Section A is approximately 42 km and stretches from the 400 kV Hendrina power station, about 40 km south of Middelburg, in Mpumalanga, towards the…

Apply Now
05 Nov 2020

At Hendrina Gumeni line has been divided into two sections which will be constructed simultaneously. Section A is approximately 42 km and stretches from the 400 kV Hendrina power station, about 40 km south of Middelburg, in Mpumalanga, towards the…

Apply Now
04 Nov 2020

At Hendrina Gumeni line has been divided into two sections which will be constructed simultaneously. Section A is approximately 42 km and stretches from the 400 kV Hendrina power station, about 40 km south of Middelburg, in Mpumalanga, towards the…

Apply Now
04 Nov 2020

At Hendrina Gumeni line has been divided into two sections which will be constructed simultaneously. Section A is approximately 42 km and stretches from the 400 kV Hendrina power station, about 40 km south of Middelburg, in Mpumalanga, towards the…